Construction setting out
and monitoring
Civil Engineering Contractors
rely upon EDM coordinates and distancing for
setting out of the larger developments.
Consider Pearce
Groups Leisure centre at Tewkesbury, Costain
Multiplex development at Stroud, Didcot
Power Station, Bridgewater Dairy
Centre, Harwell Research establishment.
Southampton Airport.
All these
areas used traditional glass prisms with Total
stations such as Leica and Trimble yet also
had Sentripod
involved in some of the setting out. Often
left insitu for the duration of the job or
temporarily used in steel and formwork
checking out and control. They add little to
the cost of the job yet save time and money
where expensive prisms may be few and far
between.
Sir Robert Mc Alpine engineers called for
Sentripod
targets in their £350m Southgate City
Centre Redevelopment at Bath Spa. Over
thirty Sentripods
being deployed on surrounding listed
buildings.
West
Contracting in Manchester uses 90
Sentripods
for Piling operations, O'Sullivans and Red
Engineering in Ireland use Sentripods for
housing set outs. Halcrow Group use them for
weirs and flood monitoring.
For versatility and lightweight
economy why not let
Sentripod prove their worth on
your site? It’s the smallest of the greatest
!
Order
Sentripods
|